Mr
Marcel Stanitzki
(DESY)
03/02/2016, 15:20
The DESY-II Test Beam Facility will resume operations in March 2016
The recent improvements and enhancements of the facility will be highlighted.
Dr
Davide Reggiani
(Paul Scherrer Institut)
03/02/2016, 16:10
This contribution will give an overview of the secondary beam lines of the PSI High Intensity Proton Accelerator (HIPA). Particular emphasis will be given to those facilities currently available for tests. Moreover, the Proton Irradiation Facility (PIF) located at the PSI PROSCAN protontherapy centre will be presented.
Mandy Rominsky
(Fermi National Accelerator Laboratory)
03/02/2016, 16:30
The Fermilab Test Beam Facility is a world class facility for testing and characterizing particle detectors. The facility has been in operation since 2005 and has undergone significant upgrades in the last two years. A second beam line with cryogenic support has been added and the facility has adopted a data acquisition system. The facility also recently added a cosmic telescope test stand and...
Dr
Carsten Hast
(SLAC National Accelerator Laboratory)
03/02/2016, 16:50
In 2015 the Caladium silicon telescope of Carleton University, Canada was loaned to SLAC and installed at the End Station Test Beam facility (ESTB). Caladium is a member of the EUDET/AIDA beam telescopes family and is now available to Users at SLAC. We will present the available infrastructure, DAQ, cooling, moving stages, etc. as well as first results of our commissioning runs.
Dr
Henric Wilkens
(CERN)
03/02/2016, 17:10
The status of the PS/SPS Testbeam Facilities are presented.