Prof. Dr. Jie Gao (Institute of High Energy Physics, Beijing, China)
→
Europe/Berlin
Sem. room 4a (DESY Hamburg)
Sem. room 4a
DESY Hamburg
Geb 1b
Description
The CEPC Project
Abstract:
In this talk we will give a bird view of the status Circular Electron Positron Collider (CEPC). The scientific goal and the collider design goal of CECP are described. The optimization of parameter designs with different energies, machine lengthes, single ring and crab-waist collision partial double ring options, etc. have been given systimatically. The machine lattice design philosophy and conrete lattice design are given. The corresponding SC RF system designs corresponding to different machine options are presented. Key issues for technology R&D and possible time schedule are addressed. The CEPC R&D fund situation and international collaborations are presented.