TCM 12-2006

Europe/Berlin
Sem Room 4b, Bdg. 1b

Sem Room 4b, Bdg. 1b

Thomas Hott (DESY)
    • 1
      Tunnel Mock-Up -> Introduction
      Speaker: T. Hott
      Slides
    • 2
      Tunnel Mock-Up -> Tenders & Contract awarding
      Speaker: F. Hilgenstock
      Slides
    • 3
      Mock-Up Infrastructure -> Electricity, Water, Air Conditionning
      Speaker: C. Schulz
      Slides
    • 4
      Cable Trays, Cables, Pipes
      Speaker: J. Havlicek, F.-R. Ullrich
    • 5
      Modules & Module-String Assembly
      Speaker: R. Lange, K. Jensch
      Slides
    • 6
      Cryo Boxes
      Speaker: B. Petersen, D. Sellmann, A. Zolotov
      Slides
    • 7
      Suspensions (Module, Cold Boxes, Interface at tunnel ceiling)
      Speaker: T. Hott
      Slides
    • 8
      Wave Guide System
      Speaker: V. Katalev
      Slides
    • 9
      Klystron & Pulse Transformer
      Speaker: R. Wagner
      Slides
    • 10:30
      Break
    • 10
      Transport & mech. installation (Modules, Cold Boxes, Wave Guides, Klystron, etc.)
      Speaker: N. Meyners
      Slides
    • 11
      Beam Pipe & Vacuum Installations (pumping stations etc.)
      Speaker: H. Remde
      Slides
    • 12
      Undulator Temperature Stabilising
      Speaker: C. Schulz, J. Pflueger
      Slides
    • 13
      Survey & Alignment
      Speaker: J. Prenting
      Slides