- Indico style
- Indico style - inline minutes
- Indico style - numbered
- Indico style - numbered + minutes
- Indico Weeks View
- BSM: add phase1 but do not put it in the CDR yet
- Tom has a new MC which works better for the edges
- table for tracking with current
- Sasha
- Process the new MCs (without playing with the weight) —> Ask Louis and Beate —> put in the online table —> ping us when it is done and where to find it
- update plot 5.7 with the inverse Compton scattering
- will send the 3D view of the geometry
- add shielding for the calo
- simplified shielding simulation with the correct IP Lanex+Cherenkov setup: already have 36 BXs - will go to at least 100 BX ideally to 1000 BX. Could have disk space issues. Estimate if it makes sense to
- John has updated the numbers for e+laser bkg-only numbers for the lanex. Need to do the same using the realistic 1.5 mm channel for the CKV.
- sampling resolution of the lanex?
- calo bkg numbers will be updated by Sasha and Shan
- Maryna will provide the information about the difference between the setup with the beampipe and without it (what we have now).
- Gianluca: will writeup about 2 profilers
- Maryna:
- will crosscheck with Halina.
- Check radiation tolerance for the lanex
- communicate offline with Beate about the study of the 1 GeV cut for the backscattering calo?