https://docs.google.com/document/d/1WGjGFANkYfpS9iCaRhTJit1YYwEZfhiWJoT6AmQr4Yg/edit?usp=sharing
Experimental Physics responsibilities (EPR)
To collect the information of the service work, which CMS group is involved in, we list the groups, conveners and available tasks:
Physics Comparisons and Generator Tunes [PCGT]
Level-3: Arman
do Bermudez Martinez (DESY), <armando.bermudez.martinez@desy.de>;
DESY tasks:
task 1, Tuning of intrinsic kt (~4 months)
task 2, MC@NLO and fixed order calculations for inclusive jets (~2 months) KL
task 3, Benchmark comparisons EW and jets (~2 months)
task 4, multi-jet merging in inclusive jets and DY+jets (~2 months)
Project: Offline Software And Computing
Activity: Data Preservation
Level-3: Data Formats (coordinator: A. Geiser, DESY)
Taskname: Legacy data formats (nanoAODplus)
Description: Define and validate (and produce) a nanoAOD-like data
format to Run1 data
expected total available EPR: 15 months
(in 2020, 13.5 months were pledged by DESY-related people)
Group: Physics Data and Monte Carlo Validation [PdmV]
Level-3: Monte Carlo Request Manager (Nur Zulaiha binti Jomhari (Nuha), nur.zulaiha.jomhari@desy.de)
Task:
Co-coordinating of the work of the generator contacts from DPG, POG and PAGs
in the preparation of the MC production workflows,
in close collaboration with the GEN group,
and co-chairing the MC Coordination Meeting (weekly on Wednesdays).
Operating the MC request management tool (McM) as administrator, dispatching workflows to the CMS computing production team, and monitoring of the production status.
Contribute to improvement and further development of the PPD production and monitoring tools (McM and pMp), in close cooperation with PPD software engineers.
Participating in the production of the validation samples.
L3 position in PdmV usually for 1 year, extendable, EPR 2-4 months per year
Group: Btagging and Vertexing for High Level Trigger HLT [BTV@HLT] in coordination with Trigger Studies Group (TSG)
Level-3: Sebastian Wuchterl (DESY) (sebastian.wuchterl@cern.ch)
4-5 Tasks, EPR discussable, ~ 2 months each
Run 3:
Validating/Studying the current reconstruction and trigger paths for Run 3 conditions
Deploying and studying DeepJet at HLT
Studying B-Tagging using Pixel (Pata-)tracks
Adding E+Mu BTagging performance trigger in the Run 3 menu
Phase 2:
Studying and developing “BTagging” using L1 Trigger information (Tracks, Vertices,Jets)