13–17 Sept 2010
Deutsches Elektronen-Synchrotron
Europe/Berlin timezone

Experience report with the Alignment Diagnostic System

17 Sept 2010, 09:00
20m
auditorium (Deutsches Elektronen-Synchrotron)

auditorium

Deutsches Elektronen-Synchrotron

Notkestraße 85 22607 Hamburg Germany
ground motion, long term monitoring, vibration D5, S1, Long Term Monitoring, Ground Motion, Vibration

Speaker

Mr Georg Gassner (SLAC National Accelerator Laboratory)

Description

Since 2009 an Alignment Diagnostic System (ADS) has been operating at the undulator of the new Linac Coherent Light Source at SLAC National Laboratory. The undulator spans a distance of 132 meters and is structured into 33 segments. Each segment is equipped with four hydrostatic leveling sensors and three wire position monitors. This report describes the set up and reflects long time experience gained with ADS.

Primary author

Mr Georg Gassner (SLAC National Accelerator Laboratory)

Presentation materials