The alignment of the LHC during the long shut-down 2008-2009

13 Sept 2010, 13:50
20m
Deutsches Elektronen-Synchrotron

Deutsches Elektronen-Synchrotron

Notkestraße 85 22607 Hamburg Germany
status reports (no oral presentation, only for poster) Day_1, Session_1, Survey & alignment of machine components & experiments

Speaker

Mr Dominique Missiaen (CERN)

Description

The first run of the LHC took place in September 2008 and was stopped brutally after only 2 weeks due to an incident provoked by an electrical short circuit in an interconnection betwen two magnets. A shut down of one year was decided in order to repare the damaged equipment and the Survey team took advantage of this period to verify and improve the alignment of the components by measuring and smoothing their position in the arcs as well as in the Long Straight Sections (LSS). This paper will cover the different operations accomplished and the results obtained.

Primary author

Mr Dominique Missiaen (CERN)

Presentation materials

There are no materials yet.