Topic: LUXE simulation and analysis TF
Meeting ID: 916 7025 7822
Password: 434044
Time: This is a recurring meeting Meet anytime
Join from PC, Mac, Linux, iOS or Android: https://weizmann.zoom.us/j/91670257822?pwd=L01uZHJMTmtmNkdpUklOTnlMU1M5QT09
Or Telephone:
Dial(for higher quality, dial a number based on your current location):
US: +1 206 337 9723 or +1 470 250 9358
United Kingdom: +44 131 460 1196 or +44 203 481 5237
Israel: +972 3 978 6688
Meeting ID: 916 7025 7822
Password: 434044
International numbers available: https://weizmann.zoom.us/u/aQxpHqFgj
Or an H.323/SIP room system:
H.323:
162.255.37.11 (US West)
162.255.36.11 (US East)
115.114.131.7 (India Mumbai)
115.114.115.7 (India Hyderabad)
213.19.144.110 (Amsterdam Netherlands)
213.244.140.110 (Germany)
103.122.166.55 (Australia)
149.137.40.110 (Singapore)
64.211.144.160 (Brazil)
69.174.57.160 (Canada)
207.226.132.110 (Japan)
Meeting ID: 916 7025 7822
Password: 434044
SIP: 91670257822@zoomcrc.com
Password: 434044
Or Skype for Business (Lync):
https://weizmann.zoom.us/skype/91670257822
Maryna:
- much larger dose all over (sometimes 2 orders of magnitude larger than phase0) but tolerable probably.
- need to process the fwd screen in both phases (need mostly signal), profiler+BSM in phase0. —> Maryna will talk with Sasha and John (need at least 10 BXs of signal and at least 1 BX of bkg)
- not related to dose but for reco: could be that we can defocus the electron beam to reduce the signal rates (without compromising xi and chi).
Sasha:
- GEANT and FLUKA are consistent enough
- interference with Ted’s elx rack seems OK (even without polyethylene)
- need to see if the photon (BSM) dump is acceptable —> need more shielding probably to stop neutrons from existing the walls for the other tunnel areas —> need to talk with Kyle so these areas are included in the FLUKA sim
Arka+Shan:
- levels of electron bkg are ~1000 per BX we need a factor of ~20 reduction
- photon levels are still too large for calo (and tracker) —> need to optimise the joint between the pipe and the triangular chamber and also put shielding plate at the back of the calo.