Present at the meeting: FM, Massimo, Ivo, Jenny, Louis, Noam, Ruth, Halina, Gianluca
Intro
- Noam will have some major comments - got delayed by E320 shifts, incoming
ELBEX
Q: where does the 40 GeV number for the dump come from? A: this is the safety requirement from the plasma energy doubler (2x max energy XFEL)
Q: space in tunnel crossing? A: should hang from ceiling, but must be checked
Laser
- laser arrived, refurbishing lab, possibily operational by end of year
Software and analysis
- meeting a few days go
- add final focus magnet in cad
- push beamline by 10-15 m
- Sasha will start putting things together in G4 model starting from existing one, prioritise check of magnets and distances (to optimise costs, i.e. permanent magnets)
C: model shared last week - A: add quads, check with Sasha
EDS
- trying to hire 1-2 PhDs (timelines limited by visas, not before 1st Sep)
PDS
- finals steps of preparation for test beam
- tungsten plates fropm germany (3)
- software being prepared
LUPE interest to move from kaldera to elbex
Photon detection system
- spectrometer: almost completed analysis software - to be tested at ZEUS in Michigan
- GRP tests at CLEAR and Italy, analysis ongoing, but performing as expected
- ready to participate in sim of new location
Q: is it ok to first migrate system as is to new location and the possibly tweak it? A: yes
Computing
- discussed minutes