Mr
Massimo Altarelli
(DESY)
23/04/2015, 09:00
Dr
Andreas Schwarz
(European XFEL)
23/04/2015, 11:40
Dr
Frank Brinker
(DESY)
23/04/2015, 12:10
Dr
Detlef Reschke
(DESY), Dr
Waldemar Singer
(DESY)
23/04/2015, 14:00
Cavity production will come to an end in fall 2015 and testing should be finished after the last retreatment of some cavities. We assume the testing will be finished end of 2015.
Markus Hüning
(DESY)
23/04/2015, 14:00
Dr
Sven Lederer
(DESY)
23/04/2015, 14:30
Dr
Walid kaabi
(LAL),
Wolf-Dietrich Möller
(DESY)
23/04/2015, 14:30
Power coupler production runs at a rate of 8 per week from Thales. From 4/2015 on we are going to receive additional 4 couplers per week from CPI. An overview will be given about the production and the testing at LAL (incl. the outlook to the CPI coupler conditioning).
Mr
Roland Platzer
(DESY)
23/04/2015, 14:45
Lutz Lilje
(DESY -MVS-)
23/04/2015, 15:00
Status of all cold vacuum components incl. number / production rate (matching the needs for an accelerated module assembly). Experience with the L1 installation will be given elsewhere (L1 Installation Session).
Dr
Jacek Sekutowicz
(DESY)
23/04/2015, 15:15
Status of the component production should be given. Emphasis should be on the availavility of absorbers for the linac installation.
Dr
Sven Lederer
(DESY)
23/04/2015, 15:15
Dr
Fernando Toral
(CIEMAT), Dr
Heiner Brueck
(DESY, MKS)
23/04/2015, 15:30
The successful finishing of the cold magnets should be reported with some concluding remarks.
Claire Simon
(CEA Saclay), Dr
Dirk Nölle
(DESY, MDI)
23/04/2015, 15:45
Availabiity of cold BPMs for BQU integration
Evgeny Negodin
(MPY)
23/04/2015, 16:15
Dr
Joachim Pflueger
(European XFEL)
23/04/2015, 16:30
Mr
Axel matheisen
(DESY), Mr
Kay Jensch
(DESY), Dr
Olivier Napoly
(CEA-Saclay), Mr
Stéphane BERRY
(CEA-Saclay)
23/04/2015, 16:30
Challenges in string & module assembly should be presented and discussed; inclduing BQU assembly.
Mr
Martin Dommach
(European XFEL)
23/04/2015, 17:00
Dr
Elmar Vogel
(DESY), Mr
Jacek Swierblewski
(MKS 1),
Lutz Lilje
(DESY -MVS-), Dr
Olivier Napoly
(CEA-Saclay),
Wolf-Dietrich Möller
(DESY)
23/04/2015, 17:15
Major non-conformities; solved issues and still ongoing challenges; emphasis on components and modules
Dr
Jan Gruenert
(European XFEL)
23/04/2015, 17:30
Mr
Jan Hauschildt
(DESY)
23/04/2015, 17:45
Mr
Jan Hauschildt
(DESY), Dr
Tobias Haas
(XFEL)
23/04/2015, 18:00
Dr
Elmar Vogel
(DESY),
Hans Weise
(DESY), Mr
Kay Jensch
(DESY),
Lutz Lilje
(DESY -MVS-), Dr
Olivier Napoly
(CEA-Saclay),
Wolf-Dietrich Möller
(DESY), Mr
axel matheisen
(DESY)
23/04/2015, 18:00
discussion of some first ideas wrt. possible module repair work should be collected; which infrastructure could be used when by whom to repair modules?
Dr
Tobias Haas
(XFEL)
24/04/2015, 09:00
Dr
Elmar Vogel
(DESY), Dr
Frank Brinker
(DESY), Mr
Kay Jensch
(DESY)
24/04/2015, 09:00
installation procedures should be presented from the 'delivery' of the two modules to the iso vac pumping; technical commissioing plans also
Dr
Gerd Wellenreuther
(XFEL)
24/04/2015, 09:20
Dr
Frank Brinker
(DESY)
24/04/2015, 09:40
Christian Bressler
(European XFEL Facility)
24/04/2015, 09:40
Dr
Adrian Mancuso
(European XFEL)
24/04/2015, 10:00
Dr
Maximilian Lederer
(European XFEL GmbH)
24/04/2015, 10:50
Mrs
Serena Barbanotti
(DESY)
24/04/2015, 11:00
Experience with cryogenic installation work. Welding procedures incl. QC. What was learned for the large series.
Mr
Cezary Sydlo
(DESY)
24/04/2015, 11:10
Lutz Lilje
(DESY -MVS-)
24/04/2015, 11:20
Experience with the vacuum installation work incl. Module connections, connections to feed/end cap, and iso vacuum
Dr
Joachim Schulz
(XFEL)
24/04/2015, 11:30
Richard Wagner
(Desy / MHFp), Dr
Stefan Choroba
(DESY), Dr
Valery Katalev
(DESY)
24/04/2015, 11:40
Dr
Markus Kuster
(European XFEL GmbH)
24/04/2015, 11:50
Evgeny Negodin
(MPY), Dr
Markus Hoffmann
(MSK)
24/04/2015, 12:00
Dr
Burkhard Heisen
(European XFEL GmbH)
24/04/2015, 12:10