Environmental slow control system for the DESY II Testbeam Area

18 Jan 2018, 11:30
15m
ETH HG E 1.2 (Zurich, Switzerland)

ETH HG E 1.2

Zurich, Switzerland

Rämistrasse 101, 8092 Zürich, Schweiz

Speaker

Dr Mengqing WU (DESY)

Description

As an ‘upgrade of beam and irradiataion test infrastucture’ within the EU AIDA2020 project, an environmental control system has been built at DESY. This system serves as a central monitoring system to log the environmental paratmers of the detector and the whole experimental area at DESY testbeam. It consists of a set of sensors and software to readout the collected data at the test beam. It is designed to be integrated into the slow control ssytem of all test beam user groups, and provides them with a ready-to-use and reliable logging system centrally maintained and supported by DESY.