TCM 12-2006

Europe/Berlin
Sem Room 4b, Bdg. 1b

Sem Room 4b, Bdg. 1b

Thomas Hott (DESY)
    • 09:00 09:05
      Tunnel Mock-Up -> Introduction 5m
      Speaker: T. Hott
      Slides
    • 09:10 09:15
      Tunnel Mock-Up -> Tenders & Contract awarding 5m
      Speaker: F. Hilgenstock
      Slides
    • 09:20 09:25
      Mock-Up Infrastructure -> Electricity, Water, Air Conditionning 5m
      Speaker: C. Schulz
      Slides
    • 09:30 09:35
      Cable Trays, Cables, Pipes 5m
      Speaker: J. Havlicek, F.-R. Ullrich
    • 09:40 09:45
      Modules & Module-String Assembly 5m
      Speaker: R. Lange, K. Jensch
      Slides
    • 09:50 09:55
      Cryo Boxes 5m
      Speaker: B. Petersen, D. Sellmann, A. Zolotov
      Slides
    • 10:00 10:05
      Suspensions (Module, Cold Boxes, Interface at tunnel ceiling) 5m
      Speaker: T. Hott
      Slides
    • 10:10 10:15
      Wave Guide System 5m
      Speaker: V. Katalev
      Slides
    • 10:15 10:20
      Klystron & Pulse Transformer 5m
      Speaker: R. Wagner
      Slides
    • 10:30 10:50
      Break 20m
    • 10:50 10:55
      Transport & mech. installation (Modules, Cold Boxes, Wave Guides, Klystron, etc.) 5m
      Speaker: N. Meyners
      Slides
    • 11:00 11:05
      Beam Pipe & Vacuum Installations (pumping stations etc.) 5m
      Speaker: H. Remde
      Slides
    • 11:10 11:15
      Undulator Temperature Stabilising 5m
      Speaker: C. Schulz, J. Pflueger
      Slides
    • 11:20 11:25
      Survey & Alignment 5m
      Speaker: J. Prenting
      Slides