20 November 2019
SR 4a/b
Europe/Berlin timezone

Prototyping and Assembly of the CMS Phase-2 Outer Tracker Endcap Support Structure

20 Nov 2019, 11:50
5m
SR 4a/b

SR 4a/b

Speaker

Mr Oskar Reichelt (DESY-CMS)

Description

For the High-Luminosity LHC, CMS will install a completely new silicon tracker. The DESY groupe participates in this project with buildung one of the tracker endcaps (TEDD). One TEDD is made of five double-disks, each equipped with detector modules on all four faces to ensure a complete coverage. The backbone of the mechanical structure of the TEDDs are highly integrated half-disks, the so-called Dees. A Dee is a carbon fiber sandwich with embedded cooling pipes and module positioning inserts.
Group DESY CMS Detector groupe

Primary author

Mr Oskar Reichelt (DESY-CMS)

Co-author

Andreas Mussgiller (DESY)

Presentation materials