23–24 Sept 2020
Virtual Meeting via Zoom
Europe/Berlin timezone

Timing and Control Impacts on RF power at FLUTE

24 Sept 2020, 16:05
5m
Virtual Meeting via Zoom

Virtual Meeting via Zoom

Speed talk Beam Controls

Speaker

Mr Thiemo Schmelzer (Karlsruhe Intitute of Technology (KIT))

Description

At the Ferninfrarot Linac und Test-Experiment (FLUTE) a regular operation with electron beam in the first section, up to 7 MeV, was achieved. For time resolved experiments the accelerating field amplitude and phase in the RF gun needs to be stable to better than 0.1%. At FLUTE a high influence of the 50 Hz AC-line power was observed and investigated. Utilizing the MRF timing distribution and the DESY LLRF system, the noise on the RF power is reduced and will be presented in this contribution.

Primary author

Mr Thiemo Schmelzer (Karlsruhe Intitute of Technology (KIT))

Presentation materials