LUXE Analysis daily

Europe/Berlin
Description
Topic: LUXE analysis daily Meeting ID: 265 178 9663 Password: 946342 Time: This is a recurring meeting Meet anytime Join from PC, Mac, Linux, iOS or Android: https://weizmann.zoom.us/j/2651789663?pwd=NWpaMzlLclpmdmtERFpYMS9DQ2gzdz09 Or Telephone: Dial(for higher quality, dial a number based on your current location): US: +1 470 250 9358 or +1 206 337 9723 United Kingdom: +44 203 481 5237 or +44 131 460 1196 Israel: +972 3 978 6688 Meeting ID: 265 178 9663 Password: 946342 International numbers available: https://weizmann.zoom.us/u/aM3jhiGHP Or an H.323/SIP room system: H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 115.114.131.7 (India Mumbai) 115.114.115.7 (India Hyderabad) 213.19.144.110 (Amsterdam Netherlands) 213.244.140.110 (Germany) 103.122.166.55 (Australia) 149.137.40.110 (Singapore) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 265 178 9663 Password: 946342 SIP: 2651789663@zoomcrc.com Password: 946342 Or Skype for Business (Lync): https://weizmann.zoom.us/skype/2651789663

Intro:
- keep adding material to the spreadsheet 
- also note the new tab for the e-beam only case

Maryna:
- added beampipe
  - w/o bp + Kapton: signal comes from the air mostly
  - w/ bp + Kapton: small signal but still larger than the bkg (too low stat)
  - w/ bp + Tungsten foil (10 um): large signal again, small background
    —> this is possible since we don’t need to terminate the vacuum in the bp case… 
- make the w/o beampipe tab in the spreadsheet
- results for phase2
  - need to understand why there are edge-like structures —> a priori we don’t expect these in this xi

Arka:
- showing the impact of manually removing the large sources of background (vacuum chamber exit window)
  - check if in slide 7 the 2 strips on the top left plot are due to the stave fixations
  - cut is sensible since the LANEX+Cherenkov were optimised
  - for both setups, some bkg also comes from the joint between the vacuum chamber and the beampipe
- showing first results from the e-bam only for the e+laser setup
- 5 keV in 25 um of 

There are minutes attached to this event. Show them.