Racks Coordination Meeting

Europe/Berlin
30b/459

30b/459

Minutes
Rack dimensions
Slides
    • 10:00 10:20
      3D-CAD modeling of racks in XTL tunnel 20m
      3D models of racks have been placed in the XTL tunnel. As a consequence, a lot of conflicts with other components have been generated. Thorsten Stoye tried to find the optimal solutions which need to be discussed.
      more information
    • 10:20 10:30
      Installation/ Installation work flow 10m
      Common remarks, statements and questions related to the racks installation will be represented
    • 10:30 10:50
      Electronics in Injector Tunnels 20m
      Actual concept of LLRF in Injector Complex will be represented. Placement of Diagnostic Electronics in the injector tunnel will be discussed.
      Slides
    • 10:50 11:10
      Electronic Racks in Undulator Tunnels 20m
      Actual status of the planning will be reported. Critical issues will be defined and discussed
    • 11:10 11:20
      Electronic Racks in Photon Tunnels 10m
      Racks coordination issues and further integration tasks will be discussed
    • 11:20 11:35
      KDS (Cable Documentation System) 15m
      In case we have some time available (and necessity is revealed - the system was already twice represented since last 2 weeks) presentation of KDS will be done