3D models of racks have been placed in the XTL tunnel. As a consequence, a lot of conflicts with other components have been generated. Thorsten Stoye tried to find the optimal solutions which need to be discussed.
more information
10:20
→
10:30
Installation/ Installation work flow10m
Common remarks, statements and questions related to the racks installation will be represented
10:30
→
10:50
Electronics in Injector Tunnels20m
Actual concept of LLRF in Injector Complex will be represented.
Placement of Diagnostic Electronics in the injector tunnel will be discussed.
Slides
10:50
→
11:10
Electronic Racks in Undulator Tunnels20m
Actual status of the planning will be reported.
Critical issues will be defined and discussed
11:10
→
11:20
Electronic Racks in Photon Tunnels10m
Racks coordination issues and further integration tasks will be discussed
11:20
→
11:35
KDS (Cable Documentation System)15m
In case we have some time available (and necessity is revealed - the system was already twice represented since last 2 weeks) presentation of KDS will be done