- Indico style
- Indico style - inline minutes
- Indico style - numbered
- Indico style - numbered + minutes
- Indico Weeks View
Meeting ID: 916 7025 7822
Password: 434044
Join from PC, Mac, Linux, iOS or Android: https://weizmann.zoom.us/j/91670257822?pwd=L01uZHJMTmtmNkdpUklOTnlMU1M5QT09
Intro:
- got CD1
- IP chamber design and location —> need to converge soon
- Complete engineering review of models —> after IP chamber is converged
Stewart:
- new 3D fluences for neutrons
- Louis and Matthew about the discrepancy in slide9: Sasha and Stewart will discuss offline to understand the differences in geometry and in the plotting procedures (could be that this is due to the simplified geometry or maybe some elements are removed - e.g. the profiler?). —> either way this plot is not what we give the radio protection people.
- there are no photons in that plot?
- will follow up in email or in one of the next meetings
Shan:
- ran sim with and w/o a 1us timing cut —> takes more time to generate the same amount of data with the 1us cut!
- how do the showers look? No shower!
- “upstream” in slide 7 means that this is anything which comes from the tracker, the window the IP chamber, etc.
- not feasible to keep generating just at TAU: need to move to DESY —> will follow up in a separate message with Yee, Sasha, Shan.