Simulation, Analysis and Software
https://desy.zoom.us/j/62178686263
Meeting-ID: 621 7868 6263
Kenncode: 884241
- Intro : Meeting bi weekly Monday at 10 AM
- What is the reason for sharing the beam pipe in ELBEX between x-ray photons and electrons? x-ray tube has to go laser straight from mirror to XTD8, in XTD8 tunnel will go anyway through LUXE setup (4.5m diameter tunnel, x-ray axis 1.4m above tunnel floor) our baseline stays electrons and x-rays in same beam tube
- Do we have a concept of a final dump? Yes, work in progress by INFN Padova meeting ELBEX requirements (currently foresee 50 b at 10 Hz at 40GeV because of Plasma energy doubling)
Roundtable:
ICS simulation (Daniel): No news, makes sense to re-run sim once beam parameters at updated location are available
Geant 4 simulation (Sasha): makes sense to re-run simulation only when final adapted beamline geometry is clear (-> alternative to TDC magnets?), important to do studies of RP dose rates (->new student at DESY ?)
Fastsim (Ruth): - No progress on Xsuite (-> follow-up with Raquel on NPOD)
Tracker (Noam): - experience at E320 shows that alignment is crucial
- should revisit Background simulations for LUXE
- Tracking software in LUXE software release?
NPOD (Raquel, Noam, Federico, Ivo): - NPOD paper being reviewed
- Federico and Ivo studied NPOD-like setups at future colliders, should discuss using full physics package in G4 for full background estimate
Next meeting: Monday November 10th 10AM