Requirements for the complete BAM-system: * The lowest level: availability of electronics for control of motors, encoder, analogue I/O, etc. * The hardware level: cabling, signal lines, limitations in latency and bandwidth etc., interfaces to other subsystems (LLRF, BPM, ...) * The software level: firmware for communication between cards in the uTCA crate, server for the BAM read-out and control * Fix all specifications * Prepare schedule for developments and tests