Simulation and Analysis TF

Europe/Berlin
Description

Topic: LUXE simulation and analysis TF
Meeting ID: 916 7025 7822
Password: 434044
Time: This is a recurring meeting Meet anytime

Join from PC, Mac, Linux, iOS or Android: https://weizmann.zoom.us/j/91670257822?pwd=L01uZHJMTmtmNkdpUklOTnlMU1M5QT09


Or Telephone:
    Dial(for higher quality, dial a number based on your current location): 
        US: +1 206 337 9723  or +1 470 250 9358 
        United Kingdom: +44 131 460 1196  or +44 203 481 5237 
        Israel: +972 3 978 6688 
    Meeting ID: 916 7025 7822
    Password: 434044
    International numbers available: https://weizmann.zoom.us/u/aQxpHqFgj

Or an H.323/SIP room system:
    H.323: 
        162.255.37.11 (US West)
        162.255.36.11 (US East)
        115.114.131.7 (India Mumbai)
        115.114.115.7 (India Hyderabad)
        213.19.144.110 (Amsterdam Netherlands)
        213.244.140.110 (Germany)
        103.122.166.55 (Australia)
        149.137.40.110 (Singapore)
        64.211.144.160 (Brazil)
        69.174.57.160 (Canada)
        207.226.132.110 (Japan)
    Meeting ID: 916 7025 7822
    Password: 434044

    SIP: 91670257822@zoomcrc.com
    Password: 434044

Or Skype for Business (Lync):
    https://weizmann.zoom.us/skype/91670257822

Intro:
- missing information for FWDCKV everywhere, FWDLNX in the ebeam-only
- fill the beam only numbers for the production progress

Tony:
- gone to 10*(1+xi^3) —> getting much more HICS photons important for the trident process where pairs are produced
- 600 positrons per BX for JETI40 at 3 um spot-size !
- table is updated —> take much longer since the calculation is very long
- add the BPPP on the same plot as the top 
- for phase2 we should go down only to ~8 um
- try to clean the dirs, also there was a problem on NAF up to yesterday
- move all things which are wrong/outdated to old/ directory
- Daniel: what is the summation limit for the pair production case?
    - Tony goes up to 10^-8 of the total
    - should also behave as ~xi^3 —> Tony will validate

Sasha:
- 5,8 and 50 um point is regenerated with the new IP CKV+LANEX geometry
- fixed a few problems in the cluster
- some improvements with speeding the code
- should move the stave a few mm up/down to avoid the carbon space frame to be in the middle of the stave
- Ruth/John, Arka and Louis will process Sasha’s new files for the “very old” signal files from Tony (not the provisional!)  for 5, 8 and 50 um. we need mostly to look at the levels of backgrounds and the vertices etc.

Kyle:
- updates on the x-section
- working on radiation maps

Maryna:
- added 5 um (provisional)
- added the minimum energy cut and all points are much more aligned now (Ne vs Ng)
- add the acceptance curve vs E

Louis:
- working code —> will share with TAU
- looking at particles coming to all faces of the calo
- invert the colours of the 2D plots?

There are minutes attached to this event. Show them.
    • 10:00 10:10
      Intro 10m
      Speakers: Dr Anthony Hartin (DESY), Beate Heinemann (DESY and Freiburg University), Dr Gianluca Sarri (Queen's University Belfast), Dr Noam Tal Hod (Weizmann Institute of Science)
    • 10:10 10:25
      Signal simulation status 15m
      Speaker: Dr Anthony Hartin (DESY)
    • 10:25 10:40
      GEANT4 simulation status 15m
      Speaker: Oleksandr Borysov (DESY)
    • 10:40 10:55
      Fwd spectr. & FLUKA update 15m
      Speakers: Mr Kyle Fleck (QUB), Dr Maryna Borysova (KINR)
    • 10:55 11:15
      Bkg studies 20m
      Speakers: Arka Santra (FLC (Experimente an Lepton Collidern)), Arka Santra (Weizmann Institute of Science), Halina Abramowicz (Tel Aviv University), John Hallford (UCL), Louis Helary (DESY), Maryna Borysova (FLC (Experimente an Lepton Collidern)), Oleksandr Borysov (DESY), Ruth Jacobs (DESY Hamburg)