Topic: LUXE simulation and analysis TF
Meeting ID: 916 7025 7822
Password: 434044
Time: This is a recurring meeting Meet anytime
Join from PC, Mac, Linux, iOS or Android: https://weizmann.zoom.us/j/91670257822?pwd=L01uZHJMTmtmNkdpUklOTnlMU1M5QT09
Or Telephone:
Dial(for higher quality, dial a number based on your current location):
US: +1 206 337 9723 or +1 470 250 9358
United Kingdom: +44 131 460 1196 or +44 203 481 5237
Israel: +972 3 978 6688
Meeting ID: 916 7025 7822
Password: 434044
International numbers available: https://weizmann.zoom.us/u/aQxpHqFgj
Or an H.323/SIP room system:
H.323:
162.255.37.11 (US West)
162.255.36.11 (US East)
115.114.131.7 (India Mumbai)
115.114.115.7 (India Hyderabad)
213.19.144.110 (Amsterdam Netherlands)
213.244.140.110 (Germany)
103.122.166.55 (Australia)
149.137.40.110 (Singapore)
64.211.144.160 (Brazil)
69.174.57.160 (Canada)
207.226.132.110 (Japan)
Meeting ID: 916 7025 7822
Password: 434044
SIP: 91670257822@zoomcrc.com
Password: 434044
Or Skype for Business (Lync):
https://weizmann.zoom.us/skype/91670257822
Sasha:
- g+laser bkg sim:
- need a better model of the CALICE calo or just put the FCAL there
- IP chamber modifications
- launch as soon as possible without the calo(s) and complete the implementation in parallel —> once we have something adequate, launch another run with one of the calos (bkg should be similar to the positron side)
Asaf:
- needle? —> exists in the model
- bellow joints? —> we can just use the current design for the simulation since the joint is large enough but we have to remember that the joints should be done with large enough bellows to the rectangular chamber of the magnet (downstream the IP box) and the beampipe (upstream the IP box).
- do we need to make it smaller? —> probably not - right now we have ~15 cm clearance to the wall.
- entrance and exit should be in the same feedthrough? —> talk with Ishay, Rjendra and Matt (and Louis) —> what is needed and what can be done (and also who is doing the ICS box design)
- Rajendra: 500 mm focal length of the parabola lens?
- Sasha: note that the IP itself is not at the centre of the chamber
- Louis: please redo the model where the IP is the origin of the coordinate system
- Sasha: why do we need the 2 mirrors in the bottom left? —> answer is complicated but this is basically by design, i.e. a real requirement.
- beam dump metal+water —> need to check how much bkg flux (if at all) is generated in this dump and see if it may need to be moved?
- the beam intensity can be aggressive on the material of the mirror —> need to check if this is not going to be a problem
Arka (digitisation):
- correlate MPV to the energy deposited via the e-h pair energy —> need to calculate
Arka (background):
- what is the element sitting after the Cherenkov?
- we need to estimate the dose from neutrons
- the electrons are more energetic than what we saw in the CDR but just by a little
- electron side tracker is lowered by 15 cm but we still see lots of electrons there —> need a top plate.
- look at the fraction of Edep (it lists also the different particles) —> check if neutrons are actually contributing.
- need to remake the dose plot with the neutrons and everything
- check if the number of protons is correct.
Others:
- Maryna: we can now generate signals ourselves —> need more signal BXs for the compton analysis
- John and Shan will look at the data for next week.