2nd Follow-up Meeting on MTCA.4 Board Development

Europe/Berlin
3/304 (DESY Hamburg)

3/304

DESY Hamburg

Christopher Gerth (DESY), Marie Kristin Czwalinna (DESY), Matthias Felber (DESY)
Description
This is the 2nd follow-up Meeting of two sessions, Optical synchronization: Introduction to board development and BAM systems, of the Collaboration Workshop Advanced Techniques in LLRF control for XFEL (https://indico.desy.de/conferenceDisplay.py?confId=7135). This time the focus is on board tests, firmware and server sofware.
    • 1
      System overview: MTCA for Optical Links and BAM
      Speakers: Dr Marie Kristin Czwalinna (DESY), Mr Matthias Felber (DESY)
      Slides
    • 2
      Summary RF locking of EO Laser in 28f
      Speakers: Dr Christopher Gerth (DESY), Uros Mavric
      Slides
    • 3
      Firmware Development for RF Locking of EO Laser
      Speaker: Mr Łukasz Butkowski (ISE)
    • 4
      DAMC-FMC20 status and general FW/HW remarks
      Speaker: Michael Fenner (DESY)
      Slides
    • 5
      DRTM-PZT4 Status
      Speaker: Mr Konrad Przygoda (TUL)
      Slides
    • 6
      DRTM-AD84 Status
      Speaker: Mr Robert Meyer (DESY)
      Slides
    • 7
      Status DFMC-MD22 and DFMC-AD16
      Speaker: Mr Robert Meyer (DESY)
    • 8
      Status DAMC-FMC25 and DFMC-DSBAM for BAM
      Speakers: Mr Jaroslaw Szewinski (Soltan Institute for Nuclear Studies), Mr Samer Bou Habib (ISE, Warsaw University of Technology)
    • 16:30
      Coffee break
    • 9
      Discussion: Schedule HW/FW/SW Development for Laser and Link lock