4th Collaboration Meeting of the European XFEL
→
Europe/Berlin
DESY
DESY
Notkestrasse 85
22603 Hamburg
Germany
Hans Weise
(DESY),
Thomas Tschentscher
(European XFEL),
Tobias Haas
(XFEL),
Winfried Decking
(DESY)
Description
This meeting gathers the international collaboration that is presently constructing the European XFEL. The meeting covers the accelerator construction with its related infrastructure, the photon beam lines as well as the experiments.
Support
Participants
137
View full list
-
-
Plenary - Project Overview SR 4 a/b
SR 4 a/b
DESY
Notkestrasse 85 22603 Hamburg Germany- 1
- 2
- 3
- 4
-
10:40
Coffee Break
-
Plenary - Project Overview SR 4 a/b
SR 4 a/b
DESY
Notkestrasse 85 22603 Hamburg Germany- 5
- 6
- 7
-
Cold Linac: Components SR 4a/b
SR 4a/b
DESY
Notkestrasse 85 22603 Hamburg Germany- 8
-
9
Power CouplerPower coupler production runs at a rate of 8 per week from Thales. From 4/2015 on we are going to receive additional 4 couplers per week from CPI. An overview will be given about the production and the testing at LAL (incl. the outlook to the CPI coupler conditioning).Speakers: Dr Walid kaabi (LAL), Wolf-Dietrich Möller (DESY)
- 10
- 11
- 12
- 13
-
Warm Beamlines Installation - XTL CFEL SR1
CFEL SR1
DESY
Notkestrasse 85 22603 Hamburg GermanyDiscuss availability of components and review installation steps and schedule for warm beamlines.
- 14
- 15
- 16
- 17
-
15:30
Coffee Break
-
16:00
Coffee Break
-
XTD Tunnel Installation CFEL SR1 (DESY Hamburg)
CFEL SR1
DESY Hamburg
Discuss and review avaialbility of components and installation sequence for XTD tunnels.
- 18
- 19
- 20
- 21
- 22
- 23
- 24
-
Cold Linac: Assembly SR 4a/b
SR 4a/b
DESY
Notkestrasse 85 22603 Hamburg Germany-
25
String & Module AssemblyChallenges in string & module assembly should be presented and discussed; inclduing BQU assembly.Speakers: Mr Axel matheisen (DESY), Mr Kay Jensch (DESY), Dr Olivier Napoly (CEA-Saclay), Mr Stéphane BERRY (CEA-Saclay)
-
26
Non-conformitiesMajor non-conformities; solved issues and still ongoing challenges; emphasis on components and modulesSpeakers: Dr Elmar Vogel (DESY), Mr Jacek Swierblewski (MKS 1), Lutz Lilje (DESY -MVS-), Dr Olivier Napoly (CEA-Saclay), Wolf-Dietrich Möller (DESY)
-
27
Module Repair Workdiscussion of some first ideas wrt. possible module repair work should be collected; which infrastructure could be used when by whom to repair modules?Speakers: Dr Elmar Vogel (DESY), Hans Weise (DESY), Mr Kay Jensch (DESY), Lutz Lilje (DESY -MVS-), Dr Olivier Napoly (CEA-Saclay), Wolf-Dietrich Möller (DESY), Mr axel matheisen (DESY)
-
25
-
Social Event DESY Canteen Extension (DESY Hamburg)
DESY Canteen Extension
DESY Hamburg
-
-
-
Infrastructure, XHEXP1 and scientific instrumentation installations CFEL SR1
CFEL SR1
DESY
- 28
- 29
- 30
- 31
-
Injector Installation SR 4a/b
SR 4a/b
DESY
Notkestrasse 85 22603 Hamburg GermanyDiscuss all remaining steps until the final closing of the injector tunnel for cool-down.
-
32
SC module installation (included in 3rd talk of the session)installation procedures should be presented from the 'delivery' of the two modules to the iso vac pumping; technical commissioing plans alsoSpeakers: Dr Elmar Vogel (DESY), Dr Frank Brinker (DESY), Mr Kay Jensch (DESY)
- 33
- 34
- 35
-
36
AOB discussion
-
32
-
10:20
Break
-
10:30
Coffee Break
-
Infrastructure, XHEXP1 and scientific instrumentation installations CFEL SR1
CFEL SR1
DESY
- 37
- 38
- 39
- 40
- 41
-
L1 Tunnel Installation SR 4a/b
SR 4a/b
DESY
Notkestrasse 85 22603 Hamburg GermanySummarize the experince gained so far and evaluate how well we are prepared for the large series.
- 42
- 43
- 44
- 45
-